UGG 5498

Thursday, November 8, 2012

video cable

First of all want to talk about the hidden works
. In fact, the hidden works quite complex pure, including wires, water pipes, gas, telephone lines, network lines, and a series of projects. First talk about the wire. The wire main points such categories: lighting line, outlet line and air conditioning lines. The principle now house a new creation, the quality of the wire are possible, it is generally not necessary to re-cable, unless you know exactly to wire your home does not work, or you do not worry about the money. The wire part In fact, as long as the required growth and prolong can be. General lighting line with 2.5, 1.5, socket line with air conditioning lines 4. The row is a good new home air conditioning lines. So, under normal circumstances, air conditioning lines do not have to add. The wire is recommended panda. Also note, Yuba wire should pull the seat line is 2.5, if conditional, with 4 of the best in fact, in terms of electricity, in addition to the wire itself, as well as wear wires PVC pipe is what we need exceptionally note. This is due in part to the wires are in the open, it is generally not the limbs move. Out most is the line pipe. First, is the quality of the pipe line. Some better quality of line pipe set with his foot on the ground, most at least not easily trampled, which is the most fundamental requirement. Members TX thinning active Foot experiments. What tubes wear how many lines but also the workers most like to play tricks. PVC pipe is generally now have 6 points and 4 in two ways. If the condition is allowed to use six points. And stated in the budget. The tube can only wear 1.5 lighting line, and can only wear up to three wires in a tube. 6 in charge of sub-2.5 wires, you can wear a tube up and can only wear 3 2.5 wire. These are valuable construction specifications, must not be careless, or fraud by the workers. The remains is successful, otherwise the future expense of their own. Talk about the reasons for it. Wire wear in PVC pipe yard for two main reasons. First, protection and insulation; Another important reason is to ensure that the future maintenance. Imagine, when the hidden works well, one day after the event of a wire out of the problem, the wires through PVC pipe drawn back to a good can. PVC pipe wear too many wires not pull more of this later maintenance to speak of. Have to use another PVC pipe butt joints, use glue then prison. And convergence between the PVC pipe and electrical boxes must use Bo sleeve trap, do not directly docking with PVC pipe and electrical boxes. These may all the details, but the details of the problem is not solved hidden hope you TX must be valued, do not own sloppy first, do not see workers to help you think the problem. Therefore, the formal specification of the operation, the first row of PVC Wu tube befriend, then penetrate the wire. Unfortunately, the original large sector workers are not standard operation, that is, side to wear a wire while receiving sub. Oh, such practices difficult to guarantee real wire Shun harm swap. Had just said are strong electric. There are weak, telephone line, cable, CATV cable, audio cable, video cable, audio line, and so on. The weak emission method are almost the same strong electric. Of course also wear PVC pipe. Does not exceed 40% of the cross-section of PVC pipe to the cross-section of the line as well. Re-emphasized the point, do not wear too. And the strong and weak electricity absolutely can not wear with a pipe yard. And to try to leave, the interval between the strong and weak electricity is at least 20 cm or more, otherwise there will be annoyance, remember, remember. The conditional TX cable instead of telephone lines, telephone lines and cable cable row. Eight line cable, telephone use one of the two can be effective in reducing the risk of accidental disconnection telephone line failure probability is high indeed. Here shall no longer mention the line quality of the original body. Due to the general situation, TX pay more attention to the quality of the wires, This gives the workers left the chance of ramming paste. So, you also need to pay attention to the quality of the cable, telephone lines and cable TV lines. Recommended general use panda. We may all know that talk panda wire, in fact, the Panda cable, telephone lines, cable TV lines are good quality, after all, is the brand name. To feel, the texture is not the same. The audio and video cables are recommended to buy their own. Too much because this line is more expensive, the difference between good and bad, and buy themselves more at ease. Now talk about water pipes. Plumbing choice now, there are many, such as PPR pipes, brass, copper, plastic Wu aluminum-plastic Wu, PVC pipes, iron pipes and so on. In fact, from a variety of Yan consider, PPR pipes are ideal. Reason is very simple, first of all it is a very solid, good quality of PPR pipes completely comparable and brass; price there is relatively easy to receive much lower than copper; there is an important point that is healthy, no rust patina. Recommended Pilsa PPR pipes, which is the best on the market PPR pipes, it is recommended that they do not save money in this respect TX. Note that the water pipes must be 6. Pilsa PPR pipes cold water pipes and hot water pipes, the key is the thickness of the wall of distinction, it is recommended that everyone home with hot water pipes to row, thick wall, better quality, and the price did not much expensive . Before the laying of water pipes, we must make full communication and workers do not give workers can take advantage of the machine, so deliberately extend water pipes caused disputes. But here the need to focus on to emphasize that, once you find unwarranted extension of the water pipe, regardless of the circumstances in which workers must rectify. Because this is not a simple overcharged money in pipelines, but will affect the results, especially the effect of the use of hot water. The hot water pipe is scheduled to be too long, the hot water will reach the design requirements, and then change to the time trouble. Members TX must pay attention to ah! The water pipes recommendations along the wall top to go with the ceiling and other modifications, Do not laid down on the floor, once the leak you will regret late. So, line up the pipes after the water pressure test length is very important. The test must be present, and the test of time for at least 30 minutes or more, the conditions allowed, preferably one hour. 10 kg pressure, without any reduction before the test by last. Another point is the most easily overlooked, water pipes need to be fixed. Do not an invisible water pipes installed in the ceiling, and second, does not fall on the can does not need to be fixed. In fact, the fixed important reason is to minimize the sound of water. Oh, this can all renovation construction norms, we must pay attention to, ah. TX asked my plumbing ceiling modification practice, I am here on a slightly specific. Essentially water pipes according to the principle of the most owe opportunities tube row along the wall of the apex angle part. Stress again that the water pipes must be fixed, a useful dedicated buckles, roughly every meter is necessary to fix a. Conditions permit each half a meter fixed. This row method has many interests. , Thrift labor costs, without Zaoqiang. Second, the hot water pipes to a modest expansion, the cold thermal expansion shrink too long pipe buried in the wall easy to destroy. Third, in case of leakage, can immediately know and Syria, and a smaller loss. If the drain under the floor, the floor is bad. Four, relatively speaking, the maintenance easier. This row of law ought to be necessary to understand the design, that is, the pipe route approached the end of the practice and hanging. Careful and adequate communication and designers. To save the practice and theory of touch. Decoration now, under normal circumstances, the kitchen and the bathroom has a ceiling, so there is no problem. While in other places, such as the living room and hallway, where there are water pipes after the local part of the ceiling, can be deployed. To achieve win-win goal of beauty and utility. Now turn to a gas pipe. Installation of a gas pipe in the first principle is safe. So, for safety, in principle, gas pipes can not be ranked in the wall with cement seal's death. But in fact, there are now many TX home gas pipes are buried inside the wall. This is the status quo. So why, according to the construction specifications, gas tube can not be buried inside the wall? Reasons or for peace. Gas close off the space, accumulated to a certain level, if unable to Phi sent out a gas explosion, and can easily be made! This absolutely is not alarmist, a real example. So, ladies and beauty scrutiny consider initiatives gas pipe came out. Real words, buried in the wall of all the less a little more. Gas pipe with outside how to do it? Of course you want to add to retouch, otherwise also called-build? A way to pipe the gas row in the cupboard. However, this approach is wrong is quite obvious, http://www.sdhaodadang.net. Squandered the cabinet space when Peixiu the volts, it does not facilitate. Another approach is to use a similar the decor-bearing long sleeves trap gas Wu both decency, they would be guilty. Just before this long sleeves Gang difficult to buy into the off-the-shelf. But you can Naruto workers to give you a discount gold to do now. Whether gas pipe is buried inside the wall, gas pipe inspection are crucial. Species like installation barometer to test the gas pipe leaks. TX Do not be sloppy, as long as there is the slightest air leak, all necessary corrections. Corrected, then new to do the test until the gas pipe completely airtight since. Remember! Remember! Gas and water pipes to minimize the use of connectors. Some of the workers in order to fee materials, then the rest of the site with the rest of the gas pipe up to you to use. You want to firmly resist. Must be completely a straight tube, to minimize the hazards. Certain joints, such as the elbow, you must use the thick white paint, do not use. Remember, thick soap lacquer. After installing a gas pipe, after the end of the acceptance can require workers to the outside of the connector part and then coated with a thick layer of white paint, so shoo! Hidden project is too important, it is important to my people I do not know; mysteriously said so many words. In fact, there are still a lot of things did not write into it, you have what difficulties can directly ask questions. The importance of the hidden works that are very basic things, such as electricity and water media, are day-to-day career non-relative, therefore. And mostly invisible part in the decoration after the event of a failure, it is difficult to repair. Also may cause damage to the decoration the Peacemaker of things, so you must be more than a long few eye. Found the problem, even if it is a very small problem, as long as there are hidden dangers, you absolutely can not negotiate must be called the workers to be rectified. In the process, I also allow workers to rework it several times. But fortunately, we eventually solved. Would rather be a little trouble in the process of renovation, do not leave to the future. Here, want to say a little digression. Renovated situations and methods. Now generally clear package, half a pack of three all-inclusive way. Personal bias to half a pack. Now I say why. The first is the clear package. The clear package can be used, but there is one condition, you must have a very knowledgeable person! This the Qidan To understand the whole process of renovation, but also to understand the price of each part of the decoration. The less appropriate example, you buy a computer for example, buy erector, or buy the original machine. Unless you are a knowledgeable person, otherwise, or to buy the original machine. Decoration but also in terms of price or time, than to buy a computer to more vast and complex. So, if you choose a clear package, the best conditions, you can fully trust among Pengpeng done in the decoration industry. Otherwise, I advise you to waste Qing package selection, of course, in both cases, you can still choose to selectively clean package. One is your funds are very limited; another is that you do not care about the quality of the decoration. Second is the all-inclusive. Most of the all-inclusive is not time, or lack of experience who choose a way. However, I strongly recommend that you do not apply the full package. The result of very simple, because all the decoration company favorite way is all-inclusive! Members can go to carefully chew taste. Remember that no matter how much you spend money. Workers are not very enthusiastic think the problem for you. This is a broad principle, except for individual workers. Moreover, because there is no monitoring, so the quality of the project can not be guaranteed, would have to be a test of the nomenclature, are simply not going to overhaul. Especially invisible part, are more likely to hastily. Meanwhile, the quality of the material is also no way to be guaranteed. Of course, you also spend more money (remember, not a little more). So, the whole package is to spend the most money to do the worst things. , Unless your fate shipped to limit surprisingly good, met a like Lei Feng renovation team, otherwise do not choose all-inclusive. Finally, half a pack. In fact, in desperation, we only select half a pack. And, for now at least half a pack or a better fitting form. Find a relative standard decoration company half a pack. Remember is relatively standardized decoration company, not the side of the road renovation team, is not real great decoration company. Renovation team can not choose the side of the road, it is estimated that we will not have what the letter asked. Here and we talk about why not find a lot of decoration company. Here a great decoration company, those companies large and there are many branches of not worry no business to do, the service attitude of the staff is obviously stiff those companies. Choose this company, first of all, you basically do not slaughter price of opportunity, happy to do what you do, otherwise you leave; Secondly, the position of the working staff will make you endure not; most important, if there are problems, companies are unlikely to conversation may be for you. Who they big? Oh, so, it is strongly recommended to choose those decoration qualification fully equipped, more formal, but not a lot of decoration company. This decoration company, but added more people to let go of. Even the workers out of the question, the average company will let's talk, because the stage in this company, they are most worried about the problem is to maintain the company's shaped like and reputation. Oh, we will take advantage of the application. Therefore, it is strongly recommended to pick half a pack, commissioned by the sort of decoration Private Secretary to implement the renovation. Heartfelt words! To start woodworking a. Carpentry, a basic principle is to make woodworking do less, and do as little as possible. The reason is very simple, is there is no way and outside the furniture factory to make furniture than furniture carpenter. First, most grant is a sense of quality. Of course there are more major is internal stuff no way ratio. Here is not in the denigration home improvement carpentry, but based on hearsay evidence. Whether from the flow of work, or singing too small,UGG Boots Adirondack, the upper hand in the furniture are furniture factory Blockboard, MDF, melamine board and veneer plywood and other materials. Remember, Blockboard is a need to minimize the use of materials, Blockboard Lu have a certain amount of formaldehyde in the indoor air-borne origin. So buy as much as possible to reach the green scales blockboard. Even so, it is recommended to use less Blockboard. The blockboard general part at the grassroots level. Such as Door, window cover innermost layer and so on. A lot of woodworking like to to Blockboard do furniture, try not to be so! Members TX before making furniture be sure and workers communicate better, where advance that what material, so good later changed trouble. The conditional best Each main materials used furniture prior written budget. When it comes to some important material was written in the budget, I slightly torn topic. Writing about the stuff written estimate single strong repair meeting, do not bother, sure, that can later correction. Because once the budget not write clearly, and renovation workers pounding the paste, the last to suffer from He. The best material written in the budget, including brand, model, size, color, etc., the more detailed the better. For example, the continental pinch of aluminum alloy, flat and two fluted (equivalent to the premise, the tablet is slightly more expensive), if you need a tablet, it must be written in the budget bright! Pull, by extension, you must regard. Closer to home, making furniture materials, multi-purpose MDF and melamine board. Melamine board, also known as single plywood or furniture board, both sides are text color veneer sheet. Flat, relatively moisture-proof, moral sense and good features, more used to do the the cabinet bulkhead, and kitchen and bathroom cabinets. Stress that can be melamine board to do the part, such as the above circumstances, to make use of melamine plates, but do not use Blockboard. Remember, the Blockboard try to use only at the grassroots level. MDF is a material, good flatness, the veneer plywood often is attached to the MDF top is a common sheet of plasterboard can rest assured you very necessary attention TX look. My home is a the Lafarge Gypsum board, to measure most of the home improvement now also used plasterboard. Note that thick gypsum board there is a difference, for example, 9mm, 12mm, etc. Suggest that you use the 12mm thick, the price is not much expensive, but more robust. Similarly, it must be stated in the budget for a single! Otherwise, in all likelihood you 9mm. There is a very easy to negligence, plasterboard try not to use stitching too much, that can use a gypsum board, resolutely not a few relaxation stitching. May your workers will say to you, the practice of stitching relatively easy to Shengliao that, do not listen to him. Stress once again that Chi must as far as possible without stitching! Stitching later painters putty in advance with the straps tied, but this practice without any nonetheless, who also can not guarantee that the problem does not occur in the future (for example, cracking, shedding, etc.). As far as possible without stitching, stitching place sure is some. Then you need to pay attention to the gap between stitching is also useful to stress. Not too big, not too small. For example, 1mm-2mm is fantasy. Stitching at the gypsum board will have the expansion must leave a gap! Most of the gypsum board to do ceiling, abdominal King and other decorative purposes, and does not affect the the malformation use of housing, but the ultimate effect of the decoration of the direct relationship, you TX must not be careless, identify problems must be corrected, even rework! Should now turn the plasterers to live. This is extremely main decoration in an integral part. Plasterers do bad will directly affect the effect of the decoration of the room. First, let's talk about the paving tile. Concrete pavement bricks before, we must advance and workers said the good following points: 1, tile vertically paste or sideways paste; 2, if there is a tile, then the tile position; 3, the belt, the belt position; 4, the sun angle part is how to deal with the (grinding 45 degrees, or the positive angle of), and so on. The tile is bristling paste or sideways paste. This complete abandon its name depends on your collective hobby, not rigidly demarcate. If you're really not sure, still bristling paste, the fruit most tile did kind bristling paste. Like some larger the tile, for example, 250 * 360, sometimes considered behalf of a loss problems, specially processed into sideways paste. Remember, it is important to see your own hobbies. 2, if the tile, it must be determined in advance the position of the tile. Tile role played gave away, under normal circumstances, with the comparison is less. So, prior to consider their own good, and workers say then, lest workers since doing the idea. 3, if there is a belt, then must determine the position of the belt. And tile, the belt the role similar. Under normal circumstances, the belt attached to the following location close to the window, this really is a good idea, unless your window is not very formal. Remember that some workers in order to consider the loss of tiles, deliberately belt affixed low, as long as it is said in advance is good, you must correct past. Remember, too low belt is really not a good look. 4, there is a very crucial problem is the local point brick Yang angle disposal. The answer is really in this surface without explore the power repeatedly, its practical Seoul hope to this problem incomparable briefly back to the root the top you wild work of my degree. That is, if a good plasterers farmers have level tool grinding tiles evil, you should not hesitate to make a choice grinding dry 45-degree angle. Up from the effect look, the only mill Lai, grinding 45-degree angle, sun angle practice, it is the most beautiful! If the level of the workers exactly is not very good, so you still choose a positive angle bar, not as good as with the positive angle of the consequences of poor 45-degree angle grinding practice. Tile sun angle, say a few more. My tile sun angle part grinding 45-degree angle. Advance and plasterers said. Plasterers to do my home bathroom tile, have worn sun angle, the overall effect is very good. Initially a change plasterers part sun angle 45 degrees angle grinder violence is indeed difficult to see, because the workers are not the first to do carefully, so I continue to do my home kitchen. Finally, of course, have been resolved. Therefore, the in tile sun angle, the following experience can be used as a reference. A grinding 45-degree angle to the ugly, as long as the workers level than with the positive angle bar. Second, grinding the poor should be pointed out that, for the first time, and clearly the workers must be replaced. Otherwise, the longer, the more difficult to replace. Third, if it does not change at the same time the problem is not very significant, tile grouts remedy instead of white cement. Speaking of the tiling, and would like to tell you TX heartfelt words. If you are like me to take a half a pack, be sure to lift stuff like tile, brick columns decoration company supply materials rather than buy their own. At the same time, must be stated in the budget the required tile brand, model, color, size and grade. The best way is to go to their first individual market optimistic about the tiles, floor tiles, and then write the budget, the decoration company price and you can buy the actual price difference is not great, then it is strongly recommended tiles by the decoration The company offers! The reason is very simple, ceramic tile is a relatively greater loss of material, if you level workers is not high, or things enough to take it seriously and carefully, then this loss will be shocking. If they buy, I will not speak of the last to be settled and workers (buy tile money you have to pay to go to get it back, and then from the workers or the company where the difficulty can be imagined), the most important thing is, every time complement brick want to run their own, it is very difficult. If half a pack of decoration companies to fulfill the last real figured the principle, you can allow the company to buy it for you, remember, remember! This is a very in-depth learning and training and experience in one. Later, at the right time, I will further tidy up, to the right company to buy those things, those things need to buy their own, make a list of Members TX see. Plasterers there is still a living, is to do the horizon. Do besylate paved brick. The brick shop to below 20 centimeters off the ground; bathroom bathtub position, as long as the tile shop to less than at the bathtub faucet on it. No pavement brick remaining part of the wall, but great stress. These places are waterproof with the following, I will to. Can show good tile cement horizon with sand do. Normal circumstances, the horizon are the verge of evening when to do it, so good, you can avoid entering riding bad horizon. Do besylate also need discretion horizon just how thick the individual case, not too thick, lest floor Order of the Shen beyond design limits. In ordinary circumstances, the kitchen, the bathroom, the horizon plus the thickness of the floor tiles than 1 centimeter or so of the low height of the living room floor, so that the kitchen, the bathroom, the water poured drip into the floor. There are a little skill, you can let the workers in the kitchen, the bathroom (especially the bathroom) and the floor of the border (this time, the floor should not yet paved, but the keel should have been done), covered points Cement, also is a barrier cement can effectively prohibit water penetration from underneath the brick to the floor. Oh, very effective method is applicable. In horizon cement dry after, you can do waterproof processing. Remember, waterproof coating not only to brush on the horizon, the left did earlier brick wall should brush on. If the bathroom has a bathtub, waterproof here to do a little higher, it is recommended to do a bathtub faucet slightly higher position. Conditions permit, bathroom, kitchen, balcony and other places can do water treatment; But in any case, the bathroom must do waterproof. Waterproof coating to dry, and you can begin to paste tiles. Here to remind you deliberately TX, before you do brick and your workers, you must be emphasized that the drainage problems in the air! It must be stressed. Otherwise, the problem, all have been late. Drainage problem of the so-called sky is the paved tiles future, the water to be very easy to flow into the floor drain any stagnant water and not in other places. This problem seems simple, but the most problematic. Some level of bad plasterers easily the ills here, so, we strongly suggest that TX focus prior to the workers pointed out. There is a very good suggestion, you can direct workers to high-altitude drop moderation in about 1.5 to 2 cm. Smaller than this gap, some parts of the ground easily hydrocephalus; higher than the gap, not very beautiful. Good tiles, you can put the last remaining wall of brick covered with. These tiles are fastened to the floor tiles, thus completing the entire tile and brick laying work. The front broadly speaking, carpenters and plasterers, plumbers (hidden works) personally experienced, should now turn to the painter. Certainly not in front of various types, of the importance of the painter, in fact, personal feelings should be the most important aspect. The reason is simple, because the painter to do the the nominal article, a new house decoration, good or bad, at least count on painters from the surface. Put it again it is a little, it is assumed that the front do not very good, if the painter a high level, at least can also conceal many defects. Members TX must pay attention to the problems of the painter! Painters work in two areas, wooden products paint, wall paint. Wood products paint. Wood products the paint points Shimizu and mixing with water two styles. Simply put, water is also wood products to Lee to face the texture of the original wood products are clearly seen, handled well, but the light can Kam people, gives a contrived feel of ancient; troubled waters is to redefine color wooden products, wood products come standard texture after paint handling has been invisible, giving young, living wave of feeling. Of course, as in the end is the use of water or mixing water, it is completely their own personal preferences, just about style issues need to be determined in the early design. From the renovation cost, clean water is slightly more expensive than the troubled waters. Shimizu decoration, nothing more than two choices, one is solid wood, the price of course, expensive; another inside with MDF, veneer plywood outside. No matter what kind of water purification than your mixing with water, that you want to advance Lengnuanzizhi. May do the walls in people's eyes, the first step is to batch the wall. In fact, not the case! Before batch wall there is a very important step need to be addressed, and if not handled well, almost destruction of the wall effect on the future against the (little exaggerated because immediately mentioned). This first step is to roll glue! Yes, indeed go to the wall and the top surface of the roller glue. Any approved wall is required to be in advance with glue and tumble The glue can be 801 construction glue. After rolling across the glue, the wall and the top surface is glue shrouded above, and so the glue is dry, putty, this approach can maximize the guarantee putty contains latex paint can not afford to shell cracking that can putty and wall adhesive. Strongly requested Members TX must be batch wall before rolling over and glue, glue spend much money, but was able to maximize the maintenance of the investment in the future. Imagine, putty batch, even latex paint brush after wall beginning from the shell crack initiation, even a one off up, when you want to remedy the consumer how much money? Or an initial preparations. Spend a little money to cover all the walls or extremely worthwhile. Possible friends would say, my house before the putty, no roll glue, now the wall is not good this? Oh, indeed, may this predicament. But the household the specific circumstances of the walls of the new homes are not the same, putty powder is not the same, you can guarantee someone's home no problem? So, or this sentence, you may be aware in advance and can be dealt with, do not go off sheep gouge prison. And redo the wall, whether it is costly, or mouth feel are extremely unhappy, remember, remember, you TX. Now the talk about putty. As Members TX understand putty is the wall treatment stage is an important process. The batch wall with putty, own tune, you can buy off-the-shelf putty powder. Elastic putty powder recommended to use off-the-shelf, you can buy some of the more famous, more secure. Such as wall breaking Po home Jiabao. My home is home Jiabao, from the effect of the use of, or compare modesty in mind. There is one detail, you need to be reminded. Whether their modulation putty or add water to adjust the home Jiabao putty powder, have to let workers use power tools to modulation, and do not let artificial way modulation (such as pounding, struggling with a wooden stick to pound go). Do not overlook this detail, using power tools, such as electricity transfer + modulation tools, putty modulation level smoothing and delicate artificial unable to do. Oh, in fact, from the details, you can also see that the construction team that you please norms. Batch wall when you just pay attention to two points on it. First batch Wall once do not grant the thick, but should be very delicate layer by layer back to the previous batch. This grant walls less finished shell off the drop. The second is to be smooth, in fact, this is one of the main objectives of the wall granted. Uneven wall formation, and is the foundation can not see the red days, unless the wall is in fact go overboard. Preferably in the evening, and then use fluorescent or red energy-saving lamps, flat against the wall according to whether Physiognomy can immediately emerged. Here to suggest that the wall what is not a mirror, it is flat as a mirror, it is virtually impossible. Members TX to do is to master a standard. Good batch of putty, chat with you paint brush. Masters paint my house, we can only talk about the Masters paint and you TX, but trust certain aspects should also be applied to other brands of paint. Masters paint is a good word-of-mouth, latex paint, the enemy whenever used master lacquer are recommended to me, this is also the main reason I used before. It now appears that, when the beginning of the selection is really nothing wrong with this can be reflected in the following text. Masters paint a more bizarre latex paint. Say it strange because its practice is so unusual. We all know the general latex paint on both sides of a bottom. Called a bottom on both sides, is approved after the putty, brush once the primer, then brush twice finish, will have a better effect. But the master of paint as long as for a bottom side, this is it extraordinary premises! We all listen to me speak slowly to. A bottom side of the great masters of paint is it reasonable. However, it should be noted that such a criterion, light-colored paint has really done a bottom side can win Free; dark paint to do a bottom side on some of the less generally elected two faces of a bottom. These are the lessons of the chat, please TX must bear in mind! As for the light-colored parts do not need to do both sides of a bottom in the end, it depends on your requirements. Under normal circumstances, as long as the painter of the level acceptable to have done before the Masters paint and a bottom side effect can be fully competent, you do not have to go to receive the nominal fee of paint; unless you do not care to spend on the paint might consider both sides of a bottom. My home is only a light portion of the bottom side, the dark part of the processing into both sides of a bottom, the effect is very ideal. This is one of the most cost-effective practices. Masters paint on the painter may paint than other brands, because the master of paint can not make up, make up part of obvious traces, you TX must be careful! So, if you have to do a masters paint, you must first ask the painter ever done Masters paint if prevarication, I advise you quickly substitutions. For a wall using the master lacquer Friends of the enemy can be the best time brush is good, do not do half the labor half. Because the other half made up, and the first half of the more obvious signs seam. Masters painted with high gloss and matt. High light shiny night lights playing up, there is a more obvious gloss is a more modern feel; matte is not shiny, traditional feeling. For in the end what kind, is entirely in your personal preferences. Just point, if you're really not sure, or recommended to use matte. Oh, the traditional role of embodied here. Is not it?

No comments:

Post a Comment